A heavy engineering client needed an out-of-gauge machinery shipment moved from Navi Mumbai to an overseas project site on a fixed installation date.
That meant coordinating a route survey, permits for the oversized load on Indian roads, specialised lifting equipment at both loading and discharge, and a sailing that could actually accommodate the dimensions involved.
The equipment arrived on schedule despite the complexity, which is generally the bar we hold ourselves to on project cargo — not just moving it, but moving it on the date the client actually needs it.